All Forums
 Help For Easy-PC Users
 Schematics
 Date Value Position Format

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert Email Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
Check here to subscribe to this topic.
   

T O P I C    R E V I E W
davep Posted - 09 Oct 2012 : 17:28:27
I use value position (save date) on schematics to identify changes while working on a current issue.
Is there any way to change the date format from dd/mm/yyyy to dd-mmm-yyyy or something similar? Date in UK is OK but exporting designs as prints causes date confusion to US etc (which use mm/dd/yyyy).
2   L A T E S T    R E P L I E S    (Newest First)
davep Posted - 10 Oct 2012 : 10:38:22
Thanks. That worked. I had previously set up windows (vista) in my required format but it must have reset itself.
robhardy Posted - 09 Oct 2012 : 18:36:56
This is set up in windows

via
Control panel

Language and setings

Formats

select additional settings

set short date to be dd/MMMM/ yyyy


This will give 09 October 2012

the page explains what the codes mean so it should be possible to set up as you wish.

Regards

Rob